| Leg | Kriens – Krienseregg – Fräkmüntegg |
| Opened | 24 December 1954 |
| Reopened | 10 May 1996 (after renovation) |
| Operation time | all year (except during revision) |
| Vertical height | 899 m |
| Length of railway section | 1: 2,118 m, section 2: 2,774 m |
| Travel speed | max. 4.5 m per sec. |
| Travel time | 18 min. (minimum) |
| Maximum conveyor capacity | 750 persons per hour |
| Holding capacity | 132 cabins for 4 persons each |
| System | Monocable railroad system |
| Drive power | 400 kW per section, drive station: Krienseregg |
| Ropes | haulage ropes: Ø 44 mm |
| Mechanical manufacturing | company: Garaventa AG, Goldau | Electrical: Frey AG, Stans |